- Carry out a pressure testing of tank heating coils to find out any leak in the line.
- Ask Engine room to open the deck steam just enough to warm up the line.
- During the warming up time open all the drain valves on deck to flush out any water in side the pipe line.
- Open steam trap valve to get rid of any condensate
- Once the pipe lines are suffciently warmed up close the drain valves and open the return lines valve.
- Ask E/R to slowly increase the steam flow and observe for any steam hammering in the pipe lines .
- If every thing feels satisfactory then increase the flow of steam depending upon the consumer steam coils.